Knit & jersey

T-shirt manufacturer in China, from 100 pieces

Tees, polos and jersey basics, placed with a documented factory we have visited in person. You pay 30% to start bulk and the 70% balance only after a third-party inspection of the finished order.

Free brief · Reply within 24h · Inspected before the balance

  • 100pcs MOQ
  • 2–4wk sampling
  • 6–8wk bulk
  • 30/70after inspection
Three short-sleeve cotton tees laid flat in white, grey and navy
Style reference: cotton tees in a flat lay (photo: Pinterest user malak waleed)
  • Front and back flats of short and long sleeve raglan tees

    Tech packExample tech pack by Pinterest user Marinnavd

  • Cutter in a mask guiding a straight knife through stacked layers of dark fabric

    CuttingCut from the approved pattern

  • Sewing hall with operators working on striped tops along long rows

    SewingTees on the line

  • Measuring a black jacket with a tape, with finished jackets stacked on the table

    InspectionMeasured against your spec

Checked before you pay

  • Third-party inspection before the balance
  • 30% deposit · 70% balance
  • Factories visited in person
  • From 100 pcs per style
  • Reply within 24h
  • No commissions from factories

Flat · TSH-01 · IllustrativeMOQ 100 pcs

1234
  1. Neck rib
  2. Shoulder seam
  3. Sleeve hem
  4. Body hem
A tech-pack style flat. Your tech pack names each of these points with a measurement and a tolerance.

What you can brief

Tees you can brief us on

Name the style, the jersey and the weight. We place it with a factory that already runs that construction, and the quote comes from the factory, on its own paper.

Styles

  • Crew and V-neck tees regular, boxy, oversized or fitted.
  • Long-sleeve tees with plain or rib cuffs.
  • Polos pique or jersey, with a knit or self-fabric collar.
  • Tanks and jersey basics for a core range that reorders.

Fabrics

  • Cotton jersey name the weight in gsm, not “heavy”.
  • Organic cotton ask for the certificate number and the mill name.
  • Cotton-poly and slub for a softer hand or a textured look.
  • Pique for polos.

Finishes and details

  • Screen print or embroidery placed and sized on the tech pack.
  • Garment dye and washes priced as an extra in the calculator.
  • Woven neck label or print label plus care and size labels.
  • Folded and polybagged ready for your warehouse.

No tech pack yet? We draw it: $79 per style, 3–5 working days, 2–3 revision rounds, one flat price.

Cost and time

What a tee costs, and how long it takes

Two numbers help before anyone quotes: the typical cut, make and trim cost, and the calculator estimate for the finished piece. Both move with fabric, trims and quantity.

Calculator estimate · T-shirt300–500 pcs

$6.00–$11.00per piece · FOB estimate

Units per styleEstimate per piece
100–300 pcs$7.20–$13.20
300–500 pcs$6.00–$11.00
500–1,000 pcs$5.28–$9.68
1,000+ pcs$4.68–$8.58

Calculator estimate for a jersey t-shirt, FOB, per piece. Mid fabric, standard construction, no extras. An estimate, not a quote: the factory quotes from your tech pack. Duty and freight are not included; confirm your HTS code with your customs broker.

What goes into the number

$4–9typical cut, make and trim per tee; fabric, trims, complexity and quantity move it
  • Fabric. Organic cotton moves the calculator estimate up by about 30%.
  • Print. A screen print adds about $1.40 a piece in the calculator; embroidery about $1.80.
  • Labels. Custom woven labels about $0.60 a piece; care and size labels about $0.30.
  • Colors. The mill sets the dye-lot minimum, so five colors of one tee can cost like five orders.
Run your own numbers in the calculator

From brief to shipment

Planned on the long end of each range: about 13 weeks plus inspection

  1. Wk 0–1Brief and factory placement reply in 24h, factory within 7 days

  2. Wk 1–5Sampling 2–4 weeks

  3. Wk 530% deposit starts bulk

  4. Wk 5–13Bulk production 6–8 weeks

  5. Wk 13Third-party inspection before shipment

  6. Wk 1370% balance, then ship after the report

UsualCan run toPayment or checkHave a ship date? Start at least 14 weeks before it. Chinese New Year closes factories for roughly 2–4 weeks.

Where we place it

Where your tees get made

Knitwear and jersey are cut and sewn around Guangzhou and Foshan. For a first run of tees, Guangdong is usually the right start.

Close view of an operator sewing a beige knit panel on an overlock machine
Operator guiding a knit panel through the overlock

Chinese New Year closes factories for roughly 2–4 weeks in late January or February, in every province. Plan the calendar around it.

First place we look · Pearl River Delta

Guangdong

Guangzhou · Dongguan · Shenzhen · Foshan

Downstream cut-and-sew, the fastest sampling we see, and fabric markets within driving distance of the lines. It suits small to mid orders of jersey basics.

MOQ
100 pcs
Sampling
2–4 wk
Bulk
6–8 wk
  1. Guangdong
  2. Zhejiang
  3. Jiangsu
  4. Fujian

Much of the knit fabric is made upstream in Zhejiang and cut in Guangdong. You don’t need to manage that: the factory buys it.

How the money moves

You pay the balance after the inspection. Not before.

The usual China horror story starts with 100% paid up front. Ours ends with a third-party inspector checking the finished order before the 70% leaves your account.

  1. 01

    Day 1

    Brief

    You send the product, quantity and date. We reply within 24 hours.

  2. 02

    Visited factory

    Quote & sample

    A factory we have visited in person quotes you directly and makes the sample.

  3. 30%

    Deposit

    30% starts bulk

    Paid to the factory once you approve the sample.

  4. Before shipment

    Third-party inspection

    An independent inspector checks the finished goods against your tech pack.

  5. 70%

    Balance

    70% then ship

    Paid only once the inspection report is back.

The factory bills you directly. Our fee, when there is one, is quoted in writing before any work starts.

Watch-outs

Three ways a tee order goes wrong

A t-shirt looks simple, which is why brands skip the checks. These are the three problems we see most, and the check that removes each one.

  • Risk 01

    The fabric gets lighter after sampling

    The sample is approved in one jersey and bulk arrives in a lighter one. Nobody lied on paper, because the weight was never written down.

    The check

    Put the fabric weight in gsm and the composition on the tech pack, and have the inspector check bulk against it before you pay the 70%.

  • Risk 02

    The neck and body twist after washing

    Jersey that was not relaxed before cutting can twist or shrink after the first wash, and you find out from your customers.

    The check

    Wash the approved sample before you sign off bulk, and give measurements with tolerances in the size chart.

  • Risk 03

    Five colors, five minimums

    You planned 100 pieces across five colors and the mill quotes a dye-lot minimum per color, not per style.

    The check

    Name every colorway in the brief. We confirm the per-color minimum with the factory before sampling, not after.

Certificates: ask for the certificate number and the mill name, not the logo. We never claim a factory holds a certificate; the factory shows it to you.

Step 1 of your brief

What are you making, and how many?

T-shirts are ticked. Add anything else in the same order, pick your units per style, and we reply within 24 hours.

Product pick any
Units per style pick one

Free · Reply within 24h · From 100 pcs per style

T-shirt questions

T-shirts from China: straight answers

What brands ask us before a first tee order, answered the way we answer by email.

Question not here?

Put it in your brief. Our team replies within 24 hours.

Send a brief

or email chinaclothinggroup@gmail.com

  • From 100 pieces per style. Custom-dyed fabric can raise the minimum per colorway, because the mill sets the dye-lot minimum, not the sewing line. Tell us every color in the brief and we confirm the real minimum before sampling.

  • Sampling takes 2–4 weeks. Bulk takes 6–8 weeks from the approved sample to goods ready to ship. If you have a ship date, start at least 14 weeks before it, and plan around Chinese New Year, when factories close for roughly two to four weeks.

  • Typical cut, make and trim is $4–9 a tee. The calculator estimate for a finished jersey tee at 300–500 pieces is $6.00–11.00 a piece, FOB, before prints and labels. The factory quotes the real number from your tech pack.

  • The factory quotes you and bills you directly. Bulk starts on a 30% deposit. The 70% balance is paid only after a third-party inspection of the finished tees. Our fee, if any, is quoted in writing before any work starts.

  • Yes, as part of the order. Put the artwork, size and placement on the tech pack. In the calculator a screen print adds about $1.40 a piece and embroidery about $1.80; the factory confirms the price at quote.

Read next

Before you send it, read these

The guide covers how to tell a factory from a trading company. The pages next to this one cover products that often ship in the same order.

Production steps

From fabric to the inspection.

Fabric, cutting, sewing and finishing, then a third-party inspection of the finished goods before the 70% balance is paid.

  • Busy sewing room with operators working through grey and white knit pieces and blue cratesKnits on the line
  • Operators in blue smocks at a line of sewing machines with thread conesSewing line with thread cones
  • Worker folding brown jersey pieces at a table while others trim behind herTrimming and folding
  • Dyed fabric in yellow, turquoise and magenta loaded in cartsDyed fabric
  • Technician in a white coat checking garments on a lit table in a quality control roomQuality control room

Free brief · Reply within 24h

Send the brief. We check the goods before you pay the balance.

Tell us what you are making. We reply within 24 hours with an honest answer on fit, and if it fits, a documented factory we have visited quotes you directly.

  • Product
  • Units per style
  • Target price
  • Ship date
  • Tech pack or references

30% deposit · 70% after third-party inspection · No commissions

Two workers marking a lilac garment panel on a table piled with grey pieces
Panels checked on the table