The technological scheme of garment production is the technical standard of garment production and product inspection. The formulation of technological scheme of garment can make garment production meet the requirements of product specification and quality, make rational use of raw materials, reduce cost, shorten product design and production cycle, and improve efficiency.

1、 Content of process planning

Clothing production includes the overall process formulation of children’s clothing, and the overall production design includes the scale and variety of clothing factory. Overall design table, which describes in detail the varieties produced by the enterprise and the distribution of personnel in each department. The equipment configuration table refers to the list of equipment required in each process according to the product variety.

2、 Clothing production preparation process formulation

(1) Design drawings include front view and back view of clothing style.

(2) According to the customer’s requirements, detailed description of customer ordering items and packaging requirements.

(3) The production notice planning department makes the production task list according to the internal and external sales order and submits it to the production department, which then arranges the production. It includes the following subdivisions:

Production notice

Contract object delivery date month day production group auxiliary material

Product number and name

Color specification and the delivery date of fabric clip

Packaging requirements

commodity

Tag

Ribbon

Plastic bag

Carton

carton

(4) The material list lists the sample cards of fabric and lining used in a garment in the corresponding use column.

Material list

Name of the contract area

Number quantity

Use of raw materials and auxiliary materials

Fabric, specifications: S M L XL

Inside seam

Outer seam

zipper

button

Button

Traction belt

Lock Eyeliner

Wrapping stitches

Trademark sampling

(5) Test data of raw and auxiliary materials test record sheet include heat resistance, color difference, colorfastness, shrinkage, etc. According to the test data, determine the cutting, sewing, ironing process requirements.

(6) Sample review sheet is mainly a size review, review the difference between sample clothing and sample. The data reviewed generally include the length, bust, collar, sleeve length, etc. According to the different types of clothing, the review parts are also different.

(7) All raw materials are listed in the raw and auxiliary materials quota table, and the difference between the quota and actual materials can be seen. Quota table of raw and auxiliary materials

Article number, product name, and specification

Tasklist No. quantity SMLXL

Name of raw and auxiliary materials door width specification quota average material quota total material average total material loss

Fabric

Lining

Lining material

zipper

button

suture

Notes tabulation

Tabulation date

(8) Problems and improvement measures of the first sample clothing in the first sample sealing list, to improve in batch production.

3、 Process planning in the garment production stage

(1) The principle of sample management is to collect and return samples. When the samples are collected and returned, they have to go through the corresponding procedures, such as signing, checking, and auditing.

(2) The number of layers and the maximum length required by the production conditions should be met; Improve production efficiency, reduce duplication of labor; Fabric saving, convenient layout.

(3) Arrange the fabric process requirements, comply with the process requirements of clothing production; Ensure the design requirements; Saving fabric; The reasonable layout method should be selected; Prevent leakage.

(4) The fabric laying process requires keeping the fabric flat; Cloth edge alignment; Reduce the pulling force on the fabric during the laying process, and cut the fabric after laying for a period of time; Pay attention to the direction of fabric; The grid needle is used to tie the required position to ensure the accuracy of the strip to the grid.

(5) The cutting process requires the selection of appropriate cutting equipment; Ensure the cutting accuracy, that is, ensure the shape or size of the garment piece; Reasonable control of cutting temperature.

(6) It is required to check the deviation of the important parts of the cut piece from the template in size and shape, and whether the deviation is within the allowable range; Whether the cutting deviation of the first layer and the last layer meets the requirements; Whether the cutting and positioning holes are accurately drilled and whether there is any omission; For fabrics with requirements for stripe and pattern, it is necessary to check whether the corresponding piece can match the stripe and pattern; Check whether there is burr or damage on the edge of the cutting piece and whether it needs to be replaced; Check whether the cutting piece is round and smooth and whether there is a tool running.

(7) The marking process requires clear and durable handwriting; The marking position is accurate; Suede fabric, in the form of labeling; For lining materials, only the specification number is needed.

(8) The bonding process requires the selection of appropriate bonding equipment and tools; After bonding, there are no aurora and bubbles, and the peeling strength is high; Consider the properties of the fabric itself when bonding.

(9) The production and processing process is the basis of making the production process, and it is also the necessary technical data for arranging the assembly line and staffing, preparing and installing the process equipment.

(10) The production process sheet is used for the quality requirements of specific specifications and parts of clothing.

(11) Process card is the embodiment of the specific process of the overall process regulations in garment production, the detailed rules of the technical specifications of processed products, and the basis of quality control.

(12) Process quota includes cutting process quota standard, sewing process quota standard, nail locking process quota standard, ironing, and packaging process quota standard.

(13) According to the different properties of various fabrics, different process parameters should be determined, that is, the pressure, temperature, humidity, and time should be appropriate;

According to the different production processes and quantity, choose suitable ironing tools and auxiliary tools; The sample size should be ironed according to the ironing sequence of different kinds of clothing to avoid aurora and ensure the consistency of products; Operate the special equipment correctly.

(14) It is an important step for garment factory to improve product quality by recording the intermediate sampling inspection and final inspection of products in the product quality inspection table to avoid repeated mistakes.

(15) The acceptance rate of finished products includes both quality and quantity. According to the relevant contents of the order contract or product design specification, the ordering unit, and the production unit shall jointly carry out quality acceptance and count the quantity.

(16) In addition to the main and auxiliary materials, the cost calculation should also consider the wages of workers, equipment loss, packaging costs, water and electricity costs, product processing costs, etc.

The above is a more detailed clothing manufacturer process, including adult clothing, children’s clothing, and so on.

    We have standardized packaging available to you. However, if your brand has any OEM or ODM packaging instructions, we can always assist you.
    Inquiry Now

    Recommend